License for the placement and operation of the facility

Regulatory

  • Purpose: Regulatory
  • Application Fees: Nil
  • License Fee: Fees vary
  • Maximum Processing Time: 6 Months
  • Related Websites: <a href="http://www.petroleum.go.ug/">www.petroleum.go.ug</a>
  • Validity: As prescribed by the Minister.
  • Contact Office: <a href="http://www.petroleum.go.ug/"><a>Directorate of Petroleum, Ministry of Energy and Mineral Development</a><br></a>
  • Renewal Fee: Fees vary
  • License Type: License
  • Legal Basis: The Petroleum (Exploration, Development and Production) Act, 2013
  • <ul><li>A detailed report on the technique to be employed.</li><li>An estimate of the time to be spent.</li><li>The material to be used and the safety measures to be employed, in the drilling of the well.</li><li>Well location, Site preparation details, Well Plan, Geological &amp; geophysical prognosis for the well, Affirmation evaluation plan. </li></ul>