License for the placement and operation of the facility

Regulatory

  • A detailed report on the technique to be employed.
  • An estimate of the time to be spent.
  • The material to be used and the safety measures to be employed, in the drilling of the well.
  • Well location, Site preparation details, Well Plan, Geological & geophysical prognosis for the well, Affirmation evaluation plan.